danaxrat.blogg.se

Pipenet pte ltd
Pipenet pte ltd













Alstom also supplied two GT13E2 gas turbines, two heat-recovery boilers, one steam turbine and the associated equipment.Īlstom has also been awarded an 18-year operation and maintenance contract for the site, covering scheduled and unscheduled maintenance as well as operation and maintenance support. The €170m contract included design, construction and commissioning of the plant. KMC awarded the contract to build the turnkey dual-fuel (gas/oil) plant to Alstom. In the Juron project, they operate in a 2x2x1 arrangement to generate 500MW. They have 53.1% combined cycle efficiency if matched with a dual pressure water/steam cycle configuration (with two gas turbines and one steam turbine).

#Pipenet pte ltd iso

M configuration (performance optimised) types feature an ISO performance rating of 172.1MW at 36.4% simple cycle efficiency on natural gas. New GT13E2 turbines incorporate further technical enhancements. Some 70 units in commercial operation have now accumulated more than two million operating hours. These modifications yielded a GT output of some 165MW and combined cycle efficiency values of more than 53% (triple pressure configuration). The resulting improvement in hot gas temperature distribution raised the turbine inlet temperature, increasing the compressor pressure ratio from 13.9:1 to 14.6:1. The new design uses Alstom’s EV (EnVironmental) dry-low NOx burner with annular combustor to replace the GT13E’s single, top-mounted ‘silo’ combustor. This engine retains the fundamental aerodynamic and mechanical design features of the GT13E as well as many of its parts. The need for higher thermal efficiency and dry-low NOx technology with emissions below 25ppm led to the development of the GT13E2 in 1991. “The project provides utilities like steam, fire-fighting water, cooling water and pipe corridor services (Pipenet) to consumers on Jurong Island.” A single ‘silo’ type combustor with a large single burner provided for a rugged and flexible engine, which is still in service today. The rotor itself was welded from a number of forged disks, resulting in a stiff and maintenance-free design with a long lifetime.

pipenet pte ltd

Compressor and turbine sections were arranged on one common rotor with journal bearings. The first GT13E turbine, commissioned in 1987, used a 21-stage compressor and a five-stage turbine, both with low-stage loading. It is fuelled by imported natural gas, with auto-switchover to diesel standby firing. The project provides utilities like steam, firefighting water, cooling water and pipe corridor services (Pipenet) to consumers on Jurong Island. The plant is operated by Keppel Merlimau Cogen (KMC) that was specially formed to develop, build, own and operate the plant. The $525m plant is located in the Tembusu sector of Jurong Island, close to several potential customers.Ĭonstruction of the plant started in March 2005 and commissioning took place in 2007. PIPENET™ Transient Module is ideal for unsteady flow problems such as ‘water hammer’, ‘steam hammer’, control systems and hydraulic forces for pipe stress analysis.The 500MW combined-cycle plant on Jurong Island supplies power to the Singaporean network. PIPENET™ Spray/Sprinkler Module sets the global standard for the design of fire protection systems especially in the oil, gas and process plant industries – deluge, ringmain, sprinkler or foam concentrate systems. Learn more… PIPENET™ Spray/Sprinkler Module PIPENET™ Standard Module is the perfect tool for solving general flow problems with liquids, gases or steam – in pipe and duct networks – cooling water systems, steam distribution systems, HVAC systems. The 3 independent modules which made up PIPENET™ PIPENET™ Standard Module

  • SUNRISE SYSTEMS is accredited with ISO 9001.
  • PIPENET™ is constantly being updated and enhanced, putting us at the forefront of pipework and pipeline design technology.
  • PIPENET™ is flexible, offers a wide selection of units, user-defined pipe schedules, fittings libraries and pump characteristics.
  • pipenet pte ltd

    PIPENET™ has been in use across the globe for over 25 years, by companies large and small, including many multinationals, in the oil and gas, process, fire protection, ship building, and power generation industries.From there it goes all the way to computing hydraulic loads for pipe stress analysis and support design, through several optional stages depending on exactly what the user requires.

    pipenet pte ltd

    It performs pipe sizing and pump selection calculations in the steady state.

    pipenet pte ltd

    PIPENET™ sets the standard – leads the way in flow analysis – the best!.Why engineers choose PIPENET™ for their HYDRAULIC Calculation?













    Pipenet pte ltd